Building bridges.....Literally!




We are in full bridge building mode!! We are replacing a steel girder bridge. The first pic below is THE AMAZING PILE DRIVER. It is a rather nasty diesel hammer that drives piles (precast concrete columns) into the ground at the expense of our ears and lungs. The smoke you see is a plywood "pad" that protects the top of the pile from such massive downforce (anywhere from 80-150 tns) and begins to burn from such friction.


A wider shot including the crane required to manuever sauch a device.

Once the piles are driven, concrete footings encase and tie in certain piles and concrete columns are formed atop these footings, as below.

These are the same columns that certain drivers make contact with when they choose to sleep and drive at the same time.

It has been a better week so far, as I have avoided certain personnel on the project. I now officially miss 100 degree heat as it topped out at 46 today, with about a -10 wind chill from interstate traffic. Inspected/tested concrete most of the day so I was wet/cold most of the day.

Since I actually spend most of my time watching/inspecting work I feel the need to count blessings.....

Thank God I was not the fella on top of the roadway paver waving to me as i drove out of sight at 6:00 pm. He is stuck there all night. Bless the people that REALLY work.

3 comments:

lime said...

holy cow, i just cannot imagine....

Mona said...

Wow! That sounds like quite some project!

Came to say hello, via, lime's blog!

Carrie said...

dude, ur kickin so much butt, i know you hate what you do, but it's so different from any other 40 year old woman with two kids and a husband! You're admirable, hands down!